Risk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnels

机译:使用故障树分析(FTA)和层次分析法(AHP)进行的风险分析适用于盾构TBM隧道

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper, the potential risk of undesirable events occurring during tunneling with application of a shield tunnel boring machine (TBM) method is discussed along with the risk analysis which can systematically assess overall risk levels. Potential risks and typical scenarios pertaining to shield TBM tunnels have been investigated based on previous case histories and correspondence with experts. The relevant risks from undesirable events were categorized into four groups: cutter-related malfunction, machine blockage or hold-up, mucking problems that hinder transporting excavated materials, and segment defects. A fault-tree set was constructed by grouping risk factors (or causes) into geological, design and construction/management factors. Risk analysis was performed by adopting fault-tree analysis (FTA) and an analytic hierarchy process (AHP) with consideration of the probability and impact of the risks. In addition, the proposed method was reliably validated by comparison with field observation, and thus indicates its applicability to risk management for shield TBM tunneling. (C) 2015 Elsevier Ltd. All rights reserved.
机译:在本文中,讨论了使用盾构隧道掘进机(TBM)方法进行掘进过程中发生不良事件的潜在风险,以及可以系统评估总体风险水平的风险分析。根据以前的案例历史并与专家联系,对与盾构TBM隧道有关的潜在风险和典型场景进行了研究。不良事件带来的相关风险可分为四类:与刀具相关的故障,机器阻塞或滞留,妨碍运输挖掘出的物料的淤渣问题以及分段缺陷。通过将风险因素(或原因)分为地质,设计和施工/管理因素来构造故障树集。考虑到风险的可能性和影响,采用故障树分析(FTA)和层次分析法(AHP)进行了风险分析。此外,通过与实地观测的比较,该方法得到了可靠的验证,从而表明了该方法在盾构TBM隧道风险管理中的适用性。 (C)2015 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号