首页> 外文期刊>Tunnelling and underground space technology >Experimental study of train-induced pressure acting on the platform screen doors in subway station
【24h】

Experimental study of train-induced pressure acting on the platform screen doors in subway station

机译:火车诱导压力作用在地铁站平台屏幕门上的实验研究

获取原文
获取原文并翻译 | 示例
           

摘要

The pressure transient on a platform screen door (PSD) is crucial for its structural safety and proper operation. This study experimentally investigated the train-induced pressure on the PSDs in a typical subway station using a moving model test system. Two typical cases were tested: the non-stop and chasing cases. In the non-stop case, the train passes through the station without stopping. In the chasing case, the train runs towards the station through the tunnel, while another train stops at the station. The train-induced pressure inside the tunnel was also tested for comparison. It was found that the train generated a compression wave when it passed the ventilation shaft of the tunnel, which was similar to that occurring when it entered the tunnel. In the non-stop case, the PSDs experienced two positive and one negative pressure peaks during the entire process. The first positive peak was dominated by the pressure wave transmitted through the tunnel; the second positive peak occurred when the train head reached the PSDs. A negative pressure peak occurred when the train tail passed by. In the chasing case, even when the incoming train was far away from the station, its pressure wave resulted in significant pressure on the PSDs, which may be the reason why the PSDs cannot open properly during rush hours.
机译:平台屏幕门(PSD)上的压力瞬态对于其结构安全性和正常运行至关重要。本研究通过移动模型测试系统通过运动模型测试系统实验在典型的地铁站中对PSD的火车诱导的压力进行了研究。测试了两个典型病例:不停和追逐病例。在不停的情况下,火车在没有停止的情况下通过车站。在追逐案例中,火车穿过隧道朝向车站,而另一列火车停在车站。还测试了隧道内部的火车诱导的压力以进行比较。发现火车在通过隧道的通风轴时产生压缩波,这类似于当它进入隧道时发生。在非停止情况下,PSD在整个过程中经历了两个正和一个负压峰。第一正峰由通过隧道传递的压力波导地位;当火车头到达PSD时,第二正峰发生。当火车尾巴通过时发生负压峰值。在追逐案例中,即使进入火车远离车站,它的压力波导致PSD上的压力很大,这可能是PSD在高峰时段内无法正常打开的原因。

著录项

  • 来源
    《Tunnelling and underground space technology》 |2021年第11期|104150.1-104150.9|共9页
  • 作者单位

    Cent South Univ Sch Civil Engn Changsha 410075 Peoples R China;

    Cent South Univ Sch Civil Engn Changsha 410075 Peoples R China|Natl Engn Lab High Speed Rail Way Construct Changsha 410075 Peoples R China;

    Cent South Univ Sch Civil Engn Changsha 410075 Peoples R China;

    Cent South Univ Sch Civil Engn Changsha 410075 Peoples R China|Natl Engn Lab High Speed Rail Way Construct Changsha 410075 Peoples R China;

    Chengdu Rail Transit Grp Co LTD Chengdu 610041 Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Platform screen door (PSD); Pressure load; Subway station; Moving model test;

    机译:平台屏幕门(PSD);压力负荷;地铁站;移动模型测试;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号