首页> 外文期刊>Transactions of Tianjin University >A New Algorithm for Resource Constraint Project Scheduling Problem Based on Multi-Agent Systems
【24h】

A New Algorithm for Resource Constraint Project Scheduling Problem Based on Multi-Agent Systems

机译:基于多Agent系统的资源约束项目调度新算法

获取原文
获取原文并翻译 | 示例

摘要

The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocation decision involved in RCPSP has also been developed. And this algorithm can be used in the multi-project scheduling field as well. Finally, an illustration is given.
机译:提出了资源受限的项目调度问题(RCPSP)和基于多主体系统(MAS)和一般均衡营销的决策模型。还开发了一种导致RCPSP中涉及的资源分配决策的算法。并且该算法也可以用于多项目调度领域。最后给出一个例子。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号