首页> 外文期刊>The Structural Engineer >Managing Health & Safety Risks
【24h】

Managing Health & Safety Risks

机译:管理健康与安全风险

获取原文
获取原文并翻译 | 示例
           

摘要

Working at height is always hazardous and article No. 17 in this series described some of the potential issues1. When very tall buildings are being designed, constructed or modified, a number of standard hazards become exaggerated and require special attention. In terms of layout, access is inherently more restricted in high-rise than on large low-rise sites. Moreover, during the construction phase, egress routes planned for the completed structure may be absent (or blocked off). To compound the generic hazards, there will be potential confusion on location: floor levels may all look the same and there might be a lack of familiarity with routes. This generates dangers for workers and for any of the emergency services who may be called in (article No. 30 describes how common site fires can be and the need to progress fire precautions in line with building advancement2). To guard against these dangers, routing signs and guidance to exits must be clear and keep up with structural height progression. Site evacuation plans need to be kept under surveillance, regularly updated and workers briefed. The reverse is also true: emergency services will need up-to-date plans to find their way around.
机译:高空作业始终是危险的,本系列的第17条描述了一些潜在的问题1。当设计,建造或修改非常高的建筑物时,许多标准危害变得夸大,需要特别注意。在布局方面,与大型低层站点相比,高层站点访问固有地受到更多限制。此外,在施工阶段,可能不存在(或封锁)为完整结构规划的出口路线。更为复杂的是,在位置上可能会造成混乱:楼层可能看上去都一样,并且可能对路线不熟悉。这对工人和可能需要召集的任何紧急服务产生了危险(第30条描述了现场火灾的普遍程度以及根据建筑进度2制定防火措施的必要性)。为了避免这些危险,必须清楚指示出口的路线标志和指引,并紧跟结构高度的变化。现场疏散计划需要保持监控,定期更新并向工人介绍情况。反之亦然:紧急服务将需要最新计划以找到解决之道。

著录项

  • 来源
    《The Structural Engineer》 |2015年第12期|35-35|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号