首页> 外文期刊>The Railway Magazine >Facelift begins for Scotrail Class 320s
【24h】

Facelift begins for Scotrail Class 320s

机译:改头换面的Scotrail Class 320s

获取原文
获取原文并翻译 | 示例

摘要

FIRST ScotRail has embarked on the refurbishment of its Class 320 fleet with the first set, No. 320014, being completed during June. The makeovers for the three-car trains is being project managed by Eversholt Rail Group and is being carried out during the routine maintenance cycles. Seven of the 22 sets are scheduled to be completed this year and the remainder by autumn 2013. One of the major components of the overhaul is the installation of new toilets that are fully compliant with disability regulations, and include a baby-changing table. This modification is costing more than £2million.
机译:第一ScotRail已着手进行其320级机队的翻新工程,第一批编号320014将于6月完成。三节车厢列车的改造工作由Eversholt铁路集团负责项目管理,并在例行维护周期内进行。 22套装置中的7套计划于今年完成,其余的计划于2013年秋季完成。大修的主要内容之一是安装完全符合残疾人法规的新厕所,其中包括一张婴儿换尿布台。这项修改的费用超过200万英镑。

著录项

  • 来源
    《The Railway Magazine》 |2011年第1325期|p.80|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号