首页> 外文期刊>Software >The use of search-based optimization techniques to schedule and staff software projects: an approach and an empirical study
【24h】

The use of search-based optimization techniques to schedule and staff software projects: an approach and an empirical study

机译:使用基于搜索的优化技术来计划和安排软件项目:方法和实证研究

获取原文
获取原文并翻译 | 示例
       

摘要

Allocating resources to a software project and assigning tasks to teams constitute crucial activities that affect project cost and completion time. Finding a solution for such a problem is NP-hard; this requires managers to be supported by proper tools for performing such an allocation. This paper shows how search-based optimization techniques can be combined with a queuing simulation model to address these problems. The obtained staff and task allocations aim to minimize the completion time and reduce schedule fragmentation. The proposed approach allows project managers to run multiple simulations, compare results and consider trade-offs between increasing the staffing level and anticipating the project completion date and between reducing the fragmentation and accepting project delays. The paper presents results from the application of the proposed search-based project planning approach to data obtained from two large-scale commercial software maintenance projects.
机译:将资源分配给软件项目并向团队分配任务是影响项目成本和完成时间的关键活动。 NP很难找到解决方案。这就要求管理者要有适当的工具来支持这种分配。本文展示了如何将基于搜索的优化技术与排队仿真模型相结合来解决这些问题。获得的人员和任务分配旨在最大程度地减少完成时间并减少计划分散性。所提出的方法使项目经理可以运行多个模拟,比较结果并考虑在增加人员配备水平和预期项目完成日期之间以及在减少分散性和接受项目延迟之间进行权衡。本文介绍了将建议的基于搜索的项目计划方法应用于从两个大型商业软件维护项目获得的数据的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号