首页> 外文期刊>Software Engineering, IEEE Transactions on >Evaluation and Measurement of Software Process Improvementȁ4;A Systematic Literature Review
【24h】

Evaluation and Measurement of Software Process Improvementȁ4;A Systematic Literature Review

机译:软件过程改进的评估与评估ȁ4;系统文献综述

获取原文
获取原文并翻译 | 示例

摘要

BACKGROUND-Software Process Improvement (SPI) is a systematic approach to increase the efficiency and effectiveness of a software development organization and to enhance software products. OBJECTIVE-This paper aims to identify and characterize evaluation strategies and measurements used to assess the impact of different SPI initiatives. METHOD-The systematic literature review includes 148 papers published between 1991 and 2008. The selected papers were classified according to SPI initiative, applied evaluation strategies, and measurement perspectives. Potential confounding factors interfering with the evaluation of the improvement effort were assessed. RESULTS-Seven distinct evaluation strategies were identified, wherein the most common one, “Pre-Post Comparison,” was applied in 49 percent of the inspected papers. Quality was the most measured attribute (62 percent), followed by Cost (41 percent), and Schedule (18 percent). Looking at measurement perspectives, “Project” represents the majority with 66 percent. CONCLUSION-The evaluation validity of SPI initiatives is challenged by the scarce consideration of potential confounding factors, particularly given that “Pre-Post Comparison” was identified as the most common evaluation strategy, and the inaccurate descriptions of the evaluation context. Measurements to assess the short and mid-term impact of SPI initiatives prevail, whereas long-term measurements in terms of customer satisfaction and return on investment tend to be less used.
机译:背景技术软件过程改进(SPI)是一种系统的方法,可以提高软件开发组织的效率和有效性并增强软件产品。目的-本文旨在确定和表征用于评估不同SPI计划的影响的评估策略和度量。方法-系统的文献综述包括1991年至2008年之间发表的148篇论文。根据SPI倡议,应用评估策略和测量观点对所选论文进行分类。评估了可能影响改进工作评估的潜在混杂因素。结果-确定了七种不同的评估策略,其中最常见的一种,即“事前比较”,被应用在49%的被检查论文中。质量是衡量最高的属性(62%),其次是成本(41%)和进度(18%)。从测量角度来看,“项目”以66%的比例占多数。结论-SPI计划的评估有效性受到对潜在混杂因素的缺乏考虑的挑战,特别是考虑到“事后比较”被确定为最常见的评估策略,并且评估背景的描述不准确。评估SPI计划的短期和中期影响的方法很普遍,而就客户满意度和投资回报率而言的长期方法则较少使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号