首页> 外文期刊>Signal >Helping the Grid to Bounce Back
【24h】

Helping the Grid to Bounce Back

机译:帮助网格反弹

获取原文
获取原文并翻译 | 示例
           

摘要

One of the most crucial elements of the nation's critical infrastructure is gradually getting the attention it believes it deserves from both the electrical power industry and the federal government. In the years to come, that effort could finally yield agreement on how best to design and implement badly needed upgrades to a key component to the daily operation of the power grid-electrical transformers-and how they would be replaced in the event of a systemwide failure or an attack on the grid itself. Electrical transformers are an important part of the power distribution system. Past wide-scale outages have been linked to failed transformers, and replacement can be a lengthy and expensive proposition.
机译:美国关键基础设施中最关键的要素之一是逐渐引起人们的关注,电力和联邦政府都应该给予它以应有的重视。在未来的几年中,这一努力最终可以就如何最好地设计和实施急需的升级来达成共识,以升级电网-电力变压器的日常运行中的关键部件,以及如何在系统范围内更换它们。故障或对电网本身的攻击。变压器是配电系统的重要组成部分。过去的大规模停电与故障变压器有关,而更换可能是一个漫长而昂贵的提议。

著录项

  • 来源
    《Signal》 |2013年第10期|37-40|共4页
  • 作者

    MAX CACAS;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号