Provisionally speaking

机译:临时来说

获取原文
获取原文并翻译 | 示例
           

摘要

Highway contracts typically contain several provisions that come into play in various scenarios which entitle the contractor to a change order. Because the requirements and prerequisites for recovery sometimes vary from provision to provision, arguments occur over which provision applies to a particular event. That was the issue in a recent Minnesota case. Storms, Inc. v, Mathy Constr. Co., 2016 Westlaw 4379391 (Minn. Aug. 17, 2016) involved a road repair project to portions of Highways 44 and 76 in Houston County for the Minnesota Department of Transportation (MnDOT). The prime, Mathy, subcontracted with Storms for excavation work, which was based upon MnDOTs estimated quantities in the prime contract.
机译:公路合同通常包含一些规定,这些规定可在各种情况下发挥作用,使承包商有权获得变更单。由于恢复的要求和先决条件有时会因准备金与准备金而异,因此会发生争辩,认为准备金适用于特定事件。那是明尼苏达州最近一案的问题。 Storms,Inc.诉Mathy Constr。 Co.,2016 Westlaw 4379391(明尼苏达州,2016年8月17日)涉及明尼苏达州交通部(MnDOT)的休斯敦县44号和76号公路部分道路修复项目。总理Mathy与Storms分包了挖掘工作,该工作基于MnDOT在总理合同中的估计数量。

著录项

  • 来源
    《Roads & bridges》 |2016年第10期|14-14|共1页
  • 作者

    Larry Caudle;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号