首页> 外文期刊>Railways Illustrated >Crossrail starts trial running
【24h】

Crossrail starts trial running

机译:Crossrail开始跑步

获取原文
获取原文并翻译 | 示例
       

摘要

CROSSRAIL COMMENCED trial running through the central core on May 10 in preparation for full services that are expected to start in the first half of 2022. The trials aim to show that the new railway is safe and reliable, and also capable of meeting capacity and performance requirements. Initial running is limited to four empty trains each way per hour, but this will steadily increase to the future timetable level. Next up in the commissioning process will be trial operations, due to get underway later in the year and including train and station evacuation exercises.
机译:Crossrail开始于5月10日通过中央核心的审判准备预计在2022年上半年开始的完整服务。试验旨在表明,新铁路安全可靠,也能够满足能力和表现。 要求。 初始运行仅限于每小时四个空列车,但这将稳步增加到未来的时间表水平。 在调试过程中,将在今年晚些时候进行试验运作,包括火车和站疏散练习。

著录项

  • 来源
    《Railways Illustrated》 |2021年第7期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号