CROSSRAIL was brought into use under the Railways and Other Guided Transport Systems (Safety) Regulations 2006 at the end of March, meaning that it has transitioned from following construction regulations to rail regulations. Control of the central section from Paddington-Abbey Wood will be handed over to Transport for London as the infrastructure manager, at which point TfL will be accountable for safety, operation and maintenance of the railway.
展开▼