首页> 外文期刊>Railways Illustrated >Harbury line reopened early
【24h】

Harbury line reopened early

机译:哈伯里线提早开放

获取原文
获取原文并翻译 | 示例
           

摘要

The leamington Spa to Banbury line reopened on March 12 - three weeks earlier than originally expected - having been closed since January 31 after a landslide near Harbury. The route between Birmingham and London, the Thames Valley and South coast is used by 130 passenger and freight trains every day. It had been closed following a 350,000 tonne landslip a few miles south of Leamington Spa. Network Rail worked 24 hours a day to repair the landslip.
机译:自1月31日在哈伯里(Harbury)附近发生山体滑坡以来已关闭,从3月12日起,比班伯里(Leeington)水疗中心至班伯里(Banbury)的线路重新开放,比原先的预期提前了三周。每天有130列客运和货运列车使用伯明翰与伦敦,泰晤士河谷和南海岸之间的路线。在Leamington Spa以南数英里处发生了350,000吨的山崩之后,它已经关闭。 Network Rail一天24小时不间断地修复山泥倾泻。

著录项

  • 来源
    《Railways Illustrated》 |2015年第5期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号