【24h】

Harbury route reopens

机译:哈伯里路线重开

获取原文
获取原文并翻译 | 示例
       

摘要

On March 13 the 05.15 Chiltern Railways Birmingham Moor Street - London Marylebone service became the first passenger train to operate between Leamington Spa and Banbury since the route was closed by a 350 000 tonne landslip at Harbury on January 31 (RBI479 p1). 'We are delighted to restore direct services between London and the West Midlands', said Chiltern Railways Managing Director Rob Brighouse. 'Thanks must be given to our partners at Network Rail, who have worked tirelessly day and night to make the area safe, and to our passengers for their patience'.
机译:3月13日,05.15奇尔特铁路伯明翰沼泽街-伦敦马里波恩铁路服务成为第一条在Leamington Spa和Banbury之间运营的客运列车,因为该路线于1月31日在Harbury被35万吨的滑坡封闭(RBI479 p1)。奇尔特恩铁路董事总经理罗布·布里格豪斯说:“我们很高兴恢复伦敦和西米德兰兹之间的直接服务。” “必须感谢我们在Network Rail上日夜不懈地工作以确保该区域安全的合作伙伴,并感谢我们的乘客的耐心等待”。

著录项

  • 来源
    《Rail Business Intelligence》 |2015年第482期|2-2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号