首页> 外文期刊>Railway Track and Structures >UTAH TRANSIT AUTHORITY FRONTRUNNER SOUTH
【24h】

UTAH TRANSIT AUTHORITY FRONTRUNNER SOUTH

机译:犹他州运输管理局前线南

获取原文
获取原文并翻译 | 示例
       

摘要

Juggling the various elements of a 45-mile, $525-million commuter rail project is challenging enough in railroad construction. Add to it the need to closely work with local communities, transit agencies and a freight railroad to make sure safety is observed and communication remains open and it becomes clear why Stacy and Witbeck, Inc./Herzog Contracting Corp., a Joint Venture, was awarded the National Railroad Construction and Maintenance Association's 2012 Railroad Construction Project of the Year, which was presented at the association's annual conference in January 2013.
机译:在铁路建设中,应对45英里,5.25亿美元的通勤铁路项目的各个要素充满挑战。此外,还需要与当地社区,运输机构和货运铁路公司紧密合作,以确保遵守安全法规并保持沟通畅通,而且很清楚为什么成立了合资企业Stacy and Witbeck,Inc./Herzog Contracting Corp.在2013年1月的协会年度会议上颁发了“美国国家铁路建设与维修协会2012年度铁路建设项目奖”。

著录项

  • 来源
    《Railway Track and Structures》 |2013年第5期|16-1820-22|共6页
  • 作者

    Mischa Wanek-Libman;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:24:57

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号