首页> 外文会议>AREMA annual conference >The Benefits and Challenges of Constructing a Commuter Rail System in Freight Mainline Corridor/Utah Transit Authority FrontRunner Project Update
【24h】

The Benefits and Challenges of Constructing a Commuter Rail System in Freight Mainline Corridor/Utah Transit Authority FrontRunner Project Update

机译:在货运干线走廊/犹他州运输当局FrontRunner项目更新中构建通勤铁路系统的好处和挑战

获取原文

摘要

The primary objective of this study is to present the lessons learned on the FrontRunner South project regarding constructing a commuter rail system within an existing freight mainline corridor. Challenges were faced in four areas: safety, scope, schedule, and budget. As the challenges were faced and overcome, benefits were gained in each of these areas, both at the project level, and community-wide. The UTA project team, through early public education outreach, clear scope definition, frequent collaborative interaction, and big-picture leadership gained win-win benefits for all parties involved.
机译:这项研究的主要目的是介绍从FrontRunner South项目获得的有关在现有货运干线走廊内建设通勤铁路系统的经验教训。在四个方面面临挑战:安全,范围,时间表和预算。随着面临和克服的挑战,在项目级别和社区范围内的每个领域都获得了收益。 UTA项目团队通过早期的公众教育,清晰的范围定义,频繁的协作互动以及全面的领导力,为所有参与方带来了双赢的利益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号