首页> 外文期刊>Rail Business Intelligence >Government ducks retendering question
【24h】

Government ducks retendering question

机译:政府鸭子重新招标问题

获取原文
获取原文并翻译 | 示例
           

摘要

With both Network Rail and South West Trains reporting good progress with their deep alliance, and growing enthusiasm for similar schemes, an issue yet to be addressed is retendering when the franchise ends. While separate legal and operational responsibilities remain in place, the NR/SWT alliances reports rapid integration of the management team.With five years of the SWT franchise still to run, the management structure of the vertically-reintegrated operation can only become even more homogenous. Equally, in entering the alliance, NR made it clear that the 'chemistry' of the parties involved was an important factor.
机译:随着Network Rail和South West Trains在深厚联盟中取得良好进展,以及对类似计划的热情不断增强,当特许经营权终止时,尚未解决的问题正在重新提出。尽管仍然承担着单独的法律和运营责任,但NR / SWT联盟报告称管理团队正在迅速整合。尽管SWT特许经营权仍需运行五年,但垂直整合业务的管理结构只会变得更加同质。同样,在加入联盟时,NR明确表示,有关各方的“化学”是一个重要因素。

著录项

  • 来源
    《Rail Business Intelligence》 |2012年第423期|p.7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号