...
首页> 外文期刊>Fortschritt-Berichte VDI-Zeitschriften >5D BIM Implementation in Switzerland Implementation strategies in Swiss organizations
【24h】

5D BIM Implementation in Switzerland Implementation strategies in Swiss organizations

机译:在瑞士实施5D BIM在瑞士组织中的实施策略

获取原文
获取原文并翻译 | 示例
           

摘要

BIM implementation can happen on various levels depending on project needs and the pace of accommodating to new technology. The benefits are already proven in different parts of the world including Europe and also the Swiss examples are building up rapidly. BIM implementation doesn't mean that the existing workflows have to be changed from one day to another, rather by identifying the greatest challenges of a certain workflow, the matching information modeling solution can easily be mapped. The successes of the first step will bring the natural appetite for utilizing more use cases and to become BIM addicts. One also should not wait for "the right project", or for "the next release" of a software application. As the article described, each and every project can benefit from the use of these approaches and because we are not talking about "a" software, but rather a different culture, process and methodology, software applications can not be the cause of delay. The key to a successful implementation is rather to have the right plan in place: throughout the mentioned "reverse engineering process" set the end goals and identify what are those steps that do not add value. Those are the steps that we first want to focus on and address with advanced technology. It is also important to remember that Building Information Modeling is a construction process itself - however might be happening partially in the virtual environment - so we have to allow the information flow. The point solutions that are aiming to solve single issues, have to fit in the overall workflow to Design, Build and Operate a facility.
机译:根据项目需求和适应新技术的步伐,BIM的实施可以在各个级别上进行。这种好处已经在包括欧洲在内的世界不同地区得到证明,而且瑞士的例子也在迅速建立。 BIM的实现并不意味着必须将现有工作流程从一天更改为另一天,而是通过确定特定工作流程的最大挑战,可以轻松地映射匹配的信息建模解决方案。第一步的成功将为利用更多用例并成为BIM上瘾者带来自然的胃口。人们也不应该等待软件应用程序的“正确的项目”或“下一个版本”。如文章所述,每个项目都可以从这些方法的使用中受益,并且因为我们不是在谈论“一种”软件,而是一种不同的文化,过程和方法,所以软件应用程序不能成为延迟的原因。成功实施的关键在于制定正确的计划:在上述“逆向工程过程”中,设定最终目标并确定哪些步骤没有增加价值。这些是我们首先要重点关注并利用先进技术解决的步骤。同样重要的是要记住,建筑物信息建模本身就是一个构建过程-但是可能部分发生在虚拟环境中-因此我们必须允许信息流。旨在解决单个问题的单点解决方案必须适合整个工作流程以设计,构建和运营设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号