首页> 外文期刊>IEEE Transactions on Power Systems >Operating reserve assessment in interconnected generating systems
【24h】

Operating reserve assessment in interconnected generating systems

机译:互联发电系统中的运营储备评估

获取原文
获取原文并翻译 | 示例

摘要

It is shown that the two risks concept can be used to determine the spinning reserve requirements of a multiarea interconnected system configuration. This is a probabilistic technique which takes into account the system parameters which directly or indirectly influence the system reliability. It is concluded that the use of a single system risk and an interconnected system risk provide valuable insight into the benefits of interconnection. These concepts are illustrated by application to two radially interconnected power systems.
机译:结果表明,两种风险概念可用于确定多区域互连系统配置的旋转备用要求。这是一种概率技术,它考虑了直接或间接影响系统可靠性的系统参数。结论是,使用单个系统风险和互连的系统风险可提供有关互连的好处的宝贵见解。通过将其应用于两个径向互连的电源系统来说明这些概念。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号