...
首页> 外文期刊>IEEE Transactions on Power Systems >Auditing control performance of interconnected areas utilizing the components concept and its decomposition and evaluation techniques. I. Audit technology and field tests
【24h】

Auditing control performance of interconnected areas utilizing the components concept and its decomposition and evaluation techniques. I. Audit technology and field tests

机译:利用组件概念及其分解和评估技术来审计互连区域的控制性能。一,审核技术和现场测试

获取原文
获取原文并翻译 | 示例
           

摘要

Tests of control performance using hourly real-time data provided by a number of US-Canadian control areas are described. The megawatt-hour magnitudes of each area's self-caused (primary) and remotely caused (secondary) inadvertent interchange components were determined, separately for on-peak and off-peak. For fuller performance evaluations, a value system based on differing values of inadvertent interchanges accumulated during a given period, even an hour, converts the megawatt-hour components into equivalent dollar values. This approach is made feasible by the use of a decomposition technique. The effect of each area's regulating deficiencies on system time deviation was determined.
机译:描述了使用由多个美国-加拿大控制区域提供的每小时实时数据进行的控制性能测试。确定了每个区域的自发(主要)和远程引起的(次要)无意交换组件的兆瓦时量级,分别针对高峰和非高峰时段。为了进行更全面的性能评估,基于在给定时间段(甚至一个小时)内累积的无意交换的价值的价值体系将兆瓦时的组成部分转换为等效的美元价值。通过使用分解技术使该方法可行。确定了每个区域的调节缺陷对系统时间偏差的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号