Priority evaluation and ranking of transmission system projects computer models and results

机译:传输系统项目计算机模型和结果的优先级评估和排名

获取原文
获取原文并翻译 | 示例

摘要

The authors describe a methodology for identifying which subset of transmission investments in a given expansion plan can be postponed in order to meet a preestablished budget constraint with the least possible impact on system performance. The methodology is based on the ranking of scheduled reinforcements by a cost/benefit index. The cost corresponds to the deterioration of operating conditions (e.g. increased risk of load curtailment) if the equipment is postponed. The benefit is associated with the financial relief brought by the postponement. A computational package for determining this ranking has been developed and is being used by the Brazilian utilities as a subsidy for deciding the adjustment of their expansion plans.
机译:作者介绍了一种方法,该方法可用于确定可以延缓给定扩展计划中的哪些输电投资子集,以便满足预先建立的预算约束,并且对系统性能的影响最小。该方法基于按成本/收益指数对排定的援军进行排名。如果设备被推迟,则成本对应于操作条件的恶化(例如,减少负荷的风险增加)。利益与推迟带来的经济救济有关。巴西公用事业公司已经开发出一种用于确定该排名的计算程序包,并用作补贴来决定其扩展计划的调整。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号