...
首页> 外文期刊>IEEE Transactions on Power Systems >Using a semi-guided Monte Carlo method for faster simulation of forced outages of generating units
【24h】

Using a semi-guided Monte Carlo method for faster simulation of forced outages of generating units

机译:使用半引导蒙特卡罗方法更快地模拟发电机组的强制停机

获取原文
获取原文并翻译 | 示例
           

摘要

The authors describe a semi-guided Monte Carlo technique to schedule forced outage periods of generating units. The key advantage of this method lies in its ability to create forced-outage schedules that are statistically balanced. When tested against the pure Monte-Carlo method, the semi-guided Monte Carlo technique provided much faster convergence and greatly reduced the number of Monte Carlo iterations required to produce reliable product cost results. The Electricity Supply Board of Ireland has implemented this technique in its chronological dispatch program.
机译:作者描述了一种半引导式蒙特卡洛技术,用于调度发电机组的强制停机时间。该方法的主要优点在于它能够创建统计上平衡的强制停机计划。当针对纯蒙特卡洛方法进行测试时,半指导蒙特卡洛技术可提供更快的收敛速度,并大大减少了产生可靠产品成本结果所需的蒙特卡洛迭代次数。爱尔兰电力供应委员会已在其时间分配计划中实施了该技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号