首页> 外文会议> >Using a semi-guided Monte Carlo method for faster simulation of forced outages of generating units
【24h】

Using a semi-guided Monte Carlo method for faster simulation of forced outages of generating units

机译:使用半引导蒙特卡罗方法更快地模拟发电机组的强制停机

获取原文

摘要

A semiguided Monte Carlo technique to schedule forced outage periods of generating units is described. The key advantage of this method lies in its ability to create forced-outage schedules that are statistically balanced. When tested against the pure Monte Carlo method, the semiguided Monte Carlo technique provided much faster convergence and greatly reduced the number of Monte Carlo iterations required to produce reliable production cost results. The Electricity Supply Board implemented this technique in its chronological dispatch program. The program can be used for a diverse spectrum of applications, from evaluating different generation expansion plans and estimating fuel requirements to evaluating the cost/benefit of improving various plant parameters, such as forced outage rates.
机译:描述了用于调度发电机组的强制停机时间的半引导蒙特卡洛技术。该方法的主要优点在于它能够创建统计上平衡的强制停机计划。当针对纯蒙特卡洛方法进行测试时,半导蒙特卡洛技术可提供更快的收敛速度,并大大减少了产生可靠的生产成本结果所需的蒙特卡洛迭代次数。电力供应委员会在其按时间分配的计划中实施了该技术。该程序可用于各种应用,从评估不同的发电计划,估算燃料需求到评估改进各种工厂参数(例如强制停机率)的成本/收益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号