首页> 外文期刊>IEEE Transactions on Power Systems >A new long-term hydro production scheduling method for maximizingthe profit of hydroelectric systems
【24h】

A new long-term hydro production scheduling method for maximizingthe profit of hydroelectric systems

机译:一种最大化水电系统利润的长期水力发电调度新方法

获取原文
获取原文并翻译 | 示例

摘要

This paper presents a new long-term hydrothermal productionnscheduling method. The proposed method maximizes the profit ofnhydroelectric plants, based on the monthly energy requirement of thensystem, instead of minimizing the production cost of thermal units. Itnis shown that different forms of composite thermal marginal costs willnlead to the same hydro production schedule. Thus a linear marginal cost,nthe simplest form, is sufficient for long-term hydrothermal scheduling.nA linear hydro marginal profit is also sufficient for this purpose. Annimmediate conclusion is that an actual composite thermal cost function,nwhich is complicated by thermal unit availability, may not be needed fornthe long-term optimal hydrothermal scheduling. Due to thisnsimplification, traditional long and mid-term hydrothermal scheduling, ancomplicated problem, becomes easier to solve. The method can be used bynthe owners of independent hydro plants in a region for long-termnhydroelectric scheduling under both deregulation and competition. A casenstudy shows that the model allocates successfully and efficiently thenhydroelectric resources to peak demand periods with negligiblencomputation time
机译:本文提出了一种新的长期热液生产调度方法。提出的方法基于系统每月的能量需求,最大化水力发电厂的利润,而不是最小化热电设备的生产成本。 Itnis表明,不同形式的复合热边际成本将导致相同的水力发电计划。因此,线性边际成本(最简单的形式)足以满足长期热液调度的需求。n线性水边际利润也足以满足此目的。即时结论是,对于长期最佳水热调度而言,可能不需要实际的复合热成本函数(其复杂程度取决于热单元的可用性)。由于这种简化,传统的长期和中期热液调度这个复杂的问题变得更容易解决。该方法可由区域内独立水电厂的所有者在放松管制和竞争的情况下用于长期水力发电调度。案例研究表明,该模型能够成功,高效地将水力资源分配到高峰时段,而计算时间可以忽略不计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号