...
首页> 外文期刊>Port Engineering Management >ABPmer to undertake a regional environmental assessment
【24h】

ABPmer to undertake a regional environmental assessment

机译:ABPmer进行区域环境评估

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

ABPmer has been appointed by Alderney Commission for Renewable Energy to prepare a broad-scale regional assessment of the potential environmental impact of possible future renewable energy development in Alderney. This is largely focused on tidal stream development within Alderney's territorial waters. The study will provide a baseline description of Alderney's environment and assess the potential effects arising from possible renewable energy development including the cumulative effects of other development. Relevant mitigation and monitoring requirements will also be identified.
机译:ABPmer已由奥尔德尼市可再生能源委员会任命,负责对奥尔德尼市未来可再生能源发展的潜在环境影响进行广泛的区域评估。这主要集中在奥尔德尼领海内的潮汐流发展。该研究将提供奥尔德尼环境的基线描述,并评估可能的可再生能源发展所产生的潜在影响,包括其他发展的累积影响。还将确定相关的缓解和监测要求。

著录项

  • 来源
    《Port Engineering Management》 |2013年第2期|23-23|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号