首页> 外文期刊>Platts Megawatt Daily >FirstEnergy mulls converting 1,710-MW plant
【24h】

FirstEnergy mulls converting 1,710-MW plant

机译:FirstEnergy改造1,710兆瓦电厂

获取原文
获取原文并翻译 | 示例
       

摘要

FirstEnergy is conducting a long-term study to determine if it would be economical to bring its 1,710-MW Hatfield's Ferry coal-fired plant back online, possibly with the capability of burning natural gas. The company deactivated the western Pennsylvania plant in October 2013 but a year later proposed to PJM Interconnection that it could reactivate the plant in 2019, Ray Dotter, a PJM spokesman, said Wednesday in an interview. PJM studied the request and the company's right to interconnect the plant through 2019 was approved.
机译:FirstEnergy正在进行一项长期研究,以确定将其1,710兆瓦Hatfield的Ferry燃煤电厂重新投入在线运行(可能具有天然气燃烧能力)是否经济。 PJM发言人雷·多特(Ray Dotter)在周三的一次采访中表示,该公司于2013年10月停用了宾夕法尼亚州西部的工厂,但一年后向PJM Interconnection提出可以在2019年重新启用该工厂。 PJM研究了该要求,并批准了公司在2019年之前将工厂互连的权利。

著录项

  • 来源
    《Platts Megawatt Daily》 |2016年第0107期|4-4|共1页
  • 作者

    Mary Powers;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:46:37

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号