首页> 外文期刊>Platts Megawatt Daily >Ohio PUC staff questions utility’s need for 900 MW of renewables
【24h】

Ohio PUC staff questions utility’s need for 900 MW of renewables

机译:俄亥俄州PUCO员工质疑公用事业需要900兆瓦可再生能源

获取原文
获取原文并翻译 | 示例
           

摘要

Ohio Power has not demonstrated a need to construct additionalelectricity generation resources to justify 900 MW of renewable energyprojects the company has proposed, state regulatory staff said inrecently filed public testimony.The American Electric Power subsidiary, which does business asAEP Ohio, is seeking approval from the Public Utilities Commission ofOhio to build out 500-MW of wind and 400 MW of solar capacity as partof a 2015 settlement of with the Sierra Club. If the commission rulesthe additional capacity is necessary, AEP Ohio would be allowed tocharge customers through a non-by-passable rider to recoup itsinvestments in the projects.
机译:州监管人员在最近提交的公开证词中说,俄亥俄州电力公司尚未证明有必要建设额外的 r n发电资源来证明该公司提出的900兆瓦可再生能源项目的合理性。 r n r nAEP俄亥俄州的电力子公司正在寻求俄亥俄州公共事业委员会的批准,以建造500兆瓦的风能和400兆瓦的太阳能发电能力,作为2015年和解协议的一部分与塞拉俱乐部。如果需要增加佣金规则,则将允许AEP Ohio通过不可绕过的骑手向客户收费,以补偿其在项目中的投资。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号