首页> 外文期刊>Inside NRC >WANO expanding early involvement in new plant construction, says CEO
【24h】

WANO expanding early involvement in new plant construction, says CEO

机译:首席执行官表示,WANO扩大了对新工厂建设的早期参与

获取原文
获取原文并翻译 | 示例

摘要

The World Association of Nuclear Operators is seeking to expand its program of inspections of new nuclear power plants in the early stages of construction, the organization’s CEO said in an interview October 5. WANO’s New Unit Assistance, or NUA, program has been in operation for about two years, Peter Prozesky said. He noted that one of the main goals of this program is to ensure that an “operating organization” for a new nuclear plant is in place well before fuel is first loaded into the plant. WANO defines an operating organization as the basic corporate and operational infrastructure to run a nuclear plant. WANO contributes to the development of such organizations in a variety of ways, including site visits, training and information provision, the WANO CEO said. Topics for this education program include safety culture and control room management, among other topics.
机译:该组织的首席执行官在10月5日的一次采访中说,世界核操作员协会正在寻求扩大其在建造初期阶段对新核电站的检查计划。WANO的新机组援助计划(NUA)已针对彼得·普罗兹斯基说,大约两年。他指出,该计划的主要目标之一是确保在将燃料首次装入核电厂之前就为新核电厂建立一个“运营组织”。 WANO将运营组织定义为运营核电站的基本公司和运营基础结构。 WANO首席执行官说,WANO以多种方式为此类组织的发展做出了贡献,包括实地考察,培训和信息提供。该教育计划的主题包括安全文化和控制室管理等。

著录项

  • 来源
    《Inside NRC》 |2018年第21期|5-6|共2页
  • 作者

    Oliver Adelman;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号