...
首页> 外文期刊>Power in Europe >Tsos rail at tougher cap
【24h】

Tsos rail at tougher cap

机译:Tsos导轨更坚固

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Regulator BNA's proposal for a lower cap on power and gas network earnings for regulatory periods beginning January 2014 and January 2013 respectively has elicited a howl of complaint from operators. The calculatory interest rate on equity, an input value for setting the allowed network earnings level, works out at 8.2% for new network facilities before corporation tax for the second regulatory periods, compared with 9.29% for the first regulatory period, the BNA said September 7. The reduction "is a result of the development of the general interest rate but also takes into account that compared with very volatile market developments in recent times, the network operation business has generated very stable and constant returns," it said.
机译:监管机构BNA关于分别降低2014年1月和2013年1月开始的监管期间电力和天然气网络收益上限的建议引起了运营商的抱怨。 BNA 9月表示,用于计算允许的网络收益水平的输入值权益计算器利率为第二个监管期内新的网络设施在公司税前的8.2%,而第一个监管期间为9.29%。 7.降价“是总体利率上升的结果,但也考虑到与近来市场波动非常大相比,网络运营业务已产生非常稳定和恒定的回报,”它说。

著录项

  • 来源
    《Power in Europe》 |2011年第609期|p.14-15|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号