【24h】

Projects

机译:专案

获取原文
获取原文并翻译 | 示例
       

摘要

Plains All American Pipeline, L.P. has entered into a commitment to construct a new 130-mile crude oil and condensate pipeline, a marine terminal facility and 1.5 MMbbls of storage capacity to service growing Eagle Ford production in south Texas. The project is expected to cost approximately $330 million and to be in service in the fourth quarter of 2012. To underpin the project, PAA has secured a long-term throughput agreement with Chesapeake Energy Marketing, Inc., a subsidiary of Chesapeake Energy Corporation. The project is designed to provide approximately 300,000 bpd of take-away capacity from the western region of the Eagle Ford play to Corpus Christi, TX and other Gulf Coast markets.
机译:Plains All American Pipeline,L.P.已承诺建设一条新的130英里原油和凝析油管道,一个海上码头设施和1.5 MMbbls的存储能力,以服务德克萨斯州南部日益增长的Eagle Ford生产。该项目预计耗资约3.3亿美元,并将于2012年第四季度投入使用。为支撑该项目,PAA已与Chesapeake Energy Corporation的子公司Chesapeake Energy Marketing,Inc.签订了长期吞吐协议。该项目旨在提供从Eagle Ford西部地区到德克萨斯州Corpus Christi和其他墨西哥湾沿岸市场约300,000 bpd的外卖能力。

著录项

  • 来源
    《Pipeline & gas journal》 |2011年第7期|p.1012|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:17:37

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号