首页> 外文期刊>PCI Journal >Accelerated bridge construction in Washington State: From research to practice
【24h】

Accelerated bridge construction in Washington State: From research to practice

机译:华盛顿州加快桥梁建设:从研究到实践

获取原文
获取原文并翻译 | 示例
           

摘要

Prefabricated bridge components are in increasing demand for accelerated bridge construction. Precasting eliminates the need for forming, casting, and curing of concrete on site, making bridge construction safer while improving quality and durability. This paper describes the development and implementation of a precast concrete bridge bent system suitable for accelerated bridge construction in high seismic zones, such as western Washington. At the base of the bent, the column is connected to a spread footing using a socket connection, while at the top the column is joined to the cap beam using bars grouted in ducts. In both cases the connection was verified by testing before the system was implemented on-site by the Washington State Department of Transportation.
机译:预制桥梁部件对加速桥梁建设的需求不断增长。预制消除了现场成型,浇铸和固化混凝土的需要,使桥梁施工更安全,同时提高了质量和耐用性。本文介绍了预制混凝土桥弯系统的开发和实施,该系统适用于华盛顿州西部等高地震区的加速桥梁建设。在弯头的底部,使用插座连接将立柱连接到扩展底座,而在顶部,使用在管道中灌浆的杆将立柱连接到顶梁。在这两种情况下,在华盛顿州交通运输部现场实施该系统之前,均已通过测试验证了连接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号