首页> 外文期刊>PCI Journal >Precast concrete replaces cast stone at Boston College
【24h】

Precast concrete replaces cast stone at Boston College

机译:波士顿学院用预制混凝土代替铸石

获取原文
获取原文并翻译 | 示例
           

摘要

Built in 1917, St. Mary's Hall was the second building constructed on the Boston College campus. The facade of this sweeping gothic structure features graceful arches and intricate detailing replete with bas-relief panels and busts that reflect the traditional architectural style of the campus. After nearly 100 years, though, the cast stone facade had begun to wear away. Canadian precast concrete designer Beton Prefabrique du Lac (BPDL) was brought in to help restore the building to its original glory. The biggest challenge, says Robert Bouchard, chief executive officer of BPDL, was that all of the elements had to be restored to the way they looked 100 years ago before they could be replicated. "The original pieces had lost a lot of their profile and degree of expression over the years," he says. "Restoring and reproducing them was very intricate work."
机译:圣玛丽堂建于1917年,是波士顿学院校园内第二座建筑。这座宽敞的哥特式建筑的立面具有优美的拱门和错综复杂的细节,并配有浅浮雕板和半身像,反映出校园的传统建筑风格。然而,将近100年后,铸石外墙开始磨损。加拿大预制混凝土设计师Beton Prefabrique du Lac(BPDL)被带进来,以帮助将建筑物恢复到最初的光彩。 BPDL首席执行官罗伯特·布沙德(Robert Bouchard)说,最大的挑战是必须将所有要素还原到100年前的样子,然后才能进行复制。他说:“这些年来,原始作品失去了很多轮廓和表达方式。” “恢复和复制它们是非常复杂的工作。”

著录项

  • 来源
    《PCI Journal》 |2015年第1期|48-49|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号