首页> 外文期刊>Offshore >Coiled tubing offers pre-commissioning tool for deepwater pipelines
【24h】

Coiled tubing offers pre-commissioning tool for deepwater pipelines

机译:连续油管为深水管道提供了预调试工具

获取原文
获取原文并翻译 | 示例
           

摘要

With this article, the authors have endeavored to demonstrate the following: 1. Down-lines play an important role in the pre-commissioning of deepwater pipelines 2. Coiled tubing should be considered as the preferred down-line system except where very large bore down-lines are required. Even then, multiple coiled tubing down-lines can be considered as an alternative. 3. Custom marine coiled tubing systems provide the flexibility for moonpool or over-the-side deployment and are largely self-supporting once installed. 4. Engineering and modeling is required prior to deploying coiled tubing in a blue-water environment. 5. A partial dewatering system offers a faster, lower cost alternative to a full wet buckle contingency dewatering system, especially for pipelines not intended for hydrostatic pressure testing.
机译:在本文中,作者努力证明以下几点:1.下行管道在深水管道的预调试中起着重要作用2.除非有很大的井筒,否则应将连续油管视为首选的下行系统-行是必需的。即使这样,也可以将多个连续油管下线视为替代方案。 3.定制的船用连续油管系统为月池或侧向部署提供了灵活性,安装后在很大程度上可自我支撑。 4.在蓝色环境中部署盘管之前,需要进行工程和建模。 5.部分脱水系统可提供比完全湿式带扣应急脱水系统更快,成本更低的替代方案,特别是对于不打算进行静水压力测试的管道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号