首页> 外文期刊>Nucleonics week >Decisions needed so UK nuclear output reaches 10 GW by early 2030s: report
【24h】

Decisions needed so UK nuclear output reaches 10 GW by early 2030s: report

机译:所以需要决定,因此英国核产出到20世纪30年代初期达到10 GW:报告

获取原文
获取原文并翻译 | 示例
       

摘要

“Urgent decisions” on a new funding model for nuclear construction and where in the UK new nuclear capacity would be sited are needed by the UK government to ensure that nuclear power generation capacity in the country stays around the 10 GW mark in the early 2030s, a report by a UK parliamentary group has found. The report, “New Zero Needs Nuclear - a Roadmap to 2024,” produced by the All-Party Parliamentary Group on Nuclear Energy, noted that, with the exception of the 1,250-MW Sizewell B pressurized water reactor, or PWR, all of the existing nuclear fleet of advanced gas-cooled reactors, or AGRs, will have retired by 2030.
机译:“迫切决定”在核建建设的新融资模式以及英国的新核能能力,是英国政府需要在20世纪30年代初期的核电发电能力围绕着10 GW标志, 发现了英国议会集团的一份报告。 该报告,“新零需要核 - 一条路线图至2024年”,由全党议会集团对核能产生,指出,除了1,250-MW Sizewell B加压水反应堆或PWR,所有的 现有的先进气冷反应堆核舰队,或者将在2030年退休。

著录项

  • 来源
    《Nucleonics week》 |2021年第27期|4-4|共1页
  • 作者

    Oliver Adelman;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 01:58:33

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号