...
首页> 外文期刊>Nuclear news >Shaw temporarily halts module prototype work
【24h】

Shaw temporarily halts module prototype work

机译:邵逸夫暂时中止模块原型工作

获取原文
获取原文并翻译 | 示例

摘要

On January 10, Nuclear Regulatory Commission personnel began an inspection at the Shaw Modular Solutions facility in Lake Charles, La., where modular components for the Westinghouse AP1000 pressurized water reactor will be fabricated. Vendor inspections will be a key aspect of the regulation of new power reactors licensed under 10 CFR Part 52, and with regard to major plant equipment, the conduct of these inspections is still at an early stage. In this particular case, the inspection could not be completed because of what the NRC referred to as "the current status of activities" at the site. The actual circumstances that caused the early termination of the inspection were not detailed.
机译:1月10日,核监管委员会人员开始对位于路易斯安那州查尔斯湖的Shaw模块化解决方案工厂进行检查,该工厂将为Westinghouse AP1000压水堆制造模块化组件。供应商检查将是根据10 CFR Part 52许可使用的新动力反应堆法规的关键方面,对于主要工厂设备,这些检查仍处于早期阶段。在这种特殊情况下,由于NRC将该站点称为“活动的当前状态”,因此无法完成检查。没有详细说明导致检查提前终止的实际情况。

著录项

  • 来源
    《Nuclear news 》 |2011年第3期| p.32| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号