首页> 美国政府科技报告 >PART I: Bioventing Test Work Plan for IRP Site FT-01 (Former Fire Training Area 1) and IRP Site SS-15 (POL Fuel Depot) Shaw AFB, South Carolina. PART II: Draft Interim Bioventing Pilot Tests Results Report IRP Site FY-01 (Former Fire Training Area 1) and IRP Site SS-15 (POL Fuel Depot) Shaw AFB, South Carolina
【24h】

PART I: Bioventing Test Work Plan for IRP Site FT-01 (Former Fire Training Area 1) and IRP Site SS-15 (POL Fuel Depot) Shaw AFB, South Carolina. PART II: Draft Interim Bioventing Pilot Tests Results Report IRP Site FY-01 (Former Fire Training Area 1) and IRP Site SS-15 (POL Fuel Depot) Shaw AFB, South Carolina

机译:第一部分:IRp site FT-01(前消防训练区1)和IRp site ss-15(pOL Fuel Depot)shaw aFB,南卡罗来纳州的Bioventing测试工作计划。第二部分:临时生物治理试验结果报告草案IRp现场FY-01(前消防训练区1)和IRp场地ss-15(pOL燃料仓库)shaw aFB,南卡罗来纳州

获取原文

摘要

This site-specific work plan presents the scope of proposed bioventing pilot tests for in situ treatment of fuel-contaminated soils at two sites at Shaw Air Force Base, Sumter, South Carolina. The first bioventing test site is located at Former Fire Training Area Number 1, designated as Installation Restoration Program (IRP) Site FT-Ol. This lRP site comprises base Operable Unit Number 4 (OU-4). The second bioventing test site is located at OU-l within the confines of the base Petroleum, Oil, and Lubricant (POL) Bulk Fuel Storage Facility (POL Depot). The pilot test area will be located in the vicinity of a former 1,000-gallon reclaimable fuels underground storage tank (UST). The proposed test area is immediately adjacent to IRP Site SS-15, the lRP designation originally assigned to a leaking 25,000-gallon UST containing JP-4 jet fuel (UST Number 5). Based on information provided by Shaw AFB, all leaking USTs and ancillary piping within the POL Depot are now considered a part of IRP Site SS-15, since releases from an unknown number of the UST systems have merged to form a somewhat contiguous plume of soil and groundwater contamination within the facility. For these reasons, the bioventing pilot test location at the POL Depot is referred to as lRP Site SS-15 in this work plan. The test objectives, test protocols and field activities presented in this work plan will be similar for both pilot test sites. Minor modifications will be made to the individual bioventing systems as required to accommodate site-specific conditions.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号