首页> 外文期刊>Nuclear news >Georgia regulators begin hearings on Vogtle's fate
【24h】

Georgia regulators begin hearings on Vogtle's fate

机译:佐治亚州监管机构开始就Vogtle的命运进行听证

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The Georgia Public Service Commission (PSC) on November 6 began hearings to determine the future of the Vogtle nuclear power plant construction project. The hearings, part of the 17th Vogtle Construction Monitoring Report, will update the project's economic performance in the wake of the bankruptcy filing of its main contractor, Westinghouse Electric Company (NN, Apr. 2017, p. 17). On August 31, Southern Company subsidiary Georgia Power, Oglethorpe Power, MEAG Power, and Dalton Utilities-the owners of the two AP1000 reactors under construction near Waynesboro, Ga.-filed their recommendations to continue with construction, based on a comprehensive schedule, cost-to-complete, and cancellation assessment (NN, Sept. 2017, p. 17). The PSC expects to issue a decision on the future of the project on February 6, according to a revised schedule approved in September (NN, Oct. 2017, p. 17).
机译:佐治亚州公共服务委员会(PSC)于11月6日开始听证,以确定Vogtle核电站建设项目的未来。听证会是《第17份Vogtle施工监测报告》的一部分,将在其主要承包商西屋电气公司破产申请后更新该项目的经济表现(NN,2017年4月,第17页)。 8月31日,位于佐治亚州韦恩斯伯勒附近的两个正在建设中的AP1000反应堆的所有者,南方公司子公司乔治亚州电力公司,Oglethorpe电力公司,MEAG电力公司和道尔顿公用事业公司根据全面的进度,成本,提出了继续建造的建议。 -完成和取消评估(NN,2017年9月,第17页)。根据9月份批准的修订时间表,PSC预计将于2月6日发布有关该项目未来的决定(NN,2017年10月,第17页)。

著录项

  • 来源
    《Nuclear news》 |2017年第13期|14-1520-22|共5页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号