首页> 外文期刊>Nuclear future >EDF Energy announces plans to restart Heysham A and Hartlepool
【24h】

EDF Energy announces plans to restart Heysham A and Hartlepool

机译:EDF Energy宣布计划重启Heysham A和Hartlepool

获取原文
获取原文并翻译 | 示例
           

摘要

EDF Energy expects to restart its two-unit Heysham A and Hartlepool gas-cooled reactor stations in phases between the end of October and the end of December. In August the company said it had decided to close four reactors at Heysham A and Hartlepool after discovering a crack on a boiler spine at Heysham A-1. The Hartlepool plant has the same boiler design as the Heysham A units. "Engineers have recently been able to begin their inspections and the first two inspections have been completed. The engineers found no defects on these spines," said EDF Energy.
机译:EDF Energy预计将在10月底至12月底之间分阶段重启其两套Heysham A和Hartlepool气冷反应堆站。该公司在八月份表示,在发现Heysham A-1的一个锅炉脊柱出现裂缝后,已决定关闭Heysham A和Hartlepool的四个反应堆。 Hartlepool工厂的锅炉设计与Heysham A机组相同。 EDF Energy说:“工程师们最近已经能够开始检查,并且前两次检查都已经完成。工程师们没有发现这些刺的缺陷。”

著录项

  • 来源
    《Nuclear future》 |2014年第5期|13-13|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号