...
首页> 外文期刊>Modern Railways >HS2'S MAIN WORKS CIVILS CONTRACTORS
【24h】

HS2'S MAIN WORKS CIVILS CONTRACTORS

机译:HS2的主要工作承包商

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Four construction teams, made up of leading contractors based across Europe, have been put in charge of building the HS2 Phase One alignment. Between them they have been allocated seven packages of work. The companies involved, and their route sections, are as follows. Victoria Road box, located to the west of where Old Oak Common station will be built, is a key staging post for this part of HS2 with SCS Railways due to launch tunnel boring machine drives south, to emerge near the cleared DB Cargo site outside Euston, and north to create the Northolt Tunnels, which will be more than 16km long. Following the Prime Minister's endorsement of the Oakervee Review there remains some uncertainty regarding exactly how the new railway will connect to Euston.
机译:由来自欧洲各地的领先承包商组成的四个施工团队已负责构建HS2一期路线。他们之间被分配了七个工作包。涉及的公司及其路线部分如下。维多利亚路盒子位于将要建造老橡树公共车站的西面,是HS2这部分与SCS铁路的重要集结站,这是由于发射隧道掘进机向南行驶,将出现在Euston外空旷的DB货运场附近,然后向北创建诺素特隧道,该隧道的长度将超过16公里。在总理批准《奥克威评论》之后,关于新铁路与尤斯顿的确切连接方式仍存在一些不确定性。

著录项

  • 来源
    《Modern Railways》 |2020年第6期|13-13|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号