首页> 外文期刊>Modern Railways >EBBW VALE FEASIBILITY STUDY REOPENED
【24h】

EBBW VALE FEASIBILITY STUDY REOPENED

机译:EBBW淡啤酒可行性研究重新开始

获取原文
获取原文并翻译 | 示例
       

摘要

WELSH ECONOMY and Transport Minister Ken Skates has reopened the feasibility study into increasing the frequency of trains on the Ebbw Vale line. The study, due to be completed by early summer, will look at the process needed to bring four trains per hour to the line by 2024 as part of the South Wales Metro. Services began on the reopened Ebbw Vale line in February 2008, with the line used by an hourly service to Cardiff. Ambitions to provide a second hourly service to Newport formed a second phase, along with extension to Ebbw Vale Town (which opened in 2015) and reopening of the branch from Aberbeeg Junction to Abertillery. However, the Welsh Government opted to pause and review the frequency enhancement work as costs escalated.The study will now see Network Rail re-examine the case following work with the Welsh Government to reduce costs. Meanwhile, the Cardiff Capital Region City Deal has identified a proposed £50 million programme of local transport schemes to support the implementation of the South Wales Metro. Included in this is the creation of a rail link from Aberbeeg to Abertillery, with a Park and Ride site for 100 vehicles.
机译:威尔士经济和运输部长肯·斯凯茨斯(Ken Skates)重新启动了可行性研究,以增加埃伯河谷(Ebbw Vale)线上火车的班次。这项研究将在初夏完成,它将研究到2024年作为南威尔士地铁的一部分每小时将四列火车送入线路所需的过程。 2008年2月,重新开通的Ebbw Vale线路开始提供服务,每小时都有一条线路通向加的夫。向纽波特提供第二小时服务的野心形成了第二阶段,同时扩展了埃伯维尔谷镇(Ebbw Vale Town)(于2015年开业),并从阿伯贝格交界处重新开张了分支机构至Abertillery。但是,随着成本的增加,威尔士政府选择暂停并审查频率增强工作。研究将看到Network Rail在与威尔士政府合作以降低成本后重新审查此案。同时,《加的夫首都地区城市协议》确定了一项拟议的5000万英镑的地方交通计划计划,以支持南威尔士地铁的实施。其中包括创建一条从阿伯贝格到阿贝蒂勒里的铁路连接线,其中有一个可停放100辆车的公园和乘车场。

著录项

  • 来源
    《Modern Railways》 |2019年第4期|17-17|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号