首页> 外文期刊>Library Journal >At Fresno State, Furniture Is On Hold
【24h】

At Fresno State, Furniture Is On Hold

机译:在弗雷斯诺州,家具被搁置

获取原文
获取原文并翻译 | 示例
       

摘要

Amid a slumping economy, libraries will be forced to find creative ways to adapt-and nowhere is that more true than at California State University, Fresno. Although the library's massive,rnstate-of-the-art $105 million building has finished construction, a statewide budget freeze means a crucial detail has been put on hold: furniture.rnA state budget shortfall held up about $8 million for the library's finishing touches, about 80 percent of the library's planned furnishings, "everything that is essentially not nailed down to the floor," said Dean Peter McDonald. The university and the library were to host a modest ribbon-cutting ceremony on February 19.
机译:在经济不景气的情况下,图书馆将被迫寻找创新的适应方法,而在弗雷斯诺加州州立大学,这是最真实的选择。尽管该图书馆规模最大,耗资1.05亿美元的最先进建筑已经完工,但全州范围的预算冻结意味着一个关键的细节已被搁置:家具。rn州政府的预算缺口使该图书馆完成了约800万美元的预算,院长彼得·麦当劳(Dean Peter McDonald)说,图书馆计划布置的家具约有80%,“基本上所有东西都没有固定在地板上。”该大学和图书馆将于2月19日举行一场温和的剪彩仪式。

著录项

  • 来源
    《Library Journal》 |2009年第4期|16|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:18:55

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号