首页> 外文期刊>Land and water >Training and Education Key for New ELGs
【24h】

Training and Education Key for New ELGs

机译:新型ELG的培训和教育重点

获取原文
获取原文并翻译 | 示例
           

摘要

The much anticipated new effluent limitations guidelines (ELGs) were published in the Federal Register on December 1, 2009. There are some changes from the draft rule which was published November 28, 2008, but for the most part it sends the same message - you will have to monitor (sample) construction site runoff for turbidity. It appears monitoring will be phased in for sites at 20 acres or greater first, and later, sites 10 acres or greater. Construction sites under 10 acres or with less than 10 acres of disturbed soil will not have to monitor.
机译:备受期待的新的污水排放限制指南(ELG)于2009年12月1日在《联邦公报》上发布。与2008年11月28日发布的规则草案相比有一些变化,但是在大多数情况下,它传达了相同的信息-您将必须监测(采样)施工现场径流的浊度。似乎将首先逐步监视20英亩或更大的站点,然后监视10英亩或更大的站点。 10英亩以下或受干扰土壤少于10英亩的建筑工地将无需监视。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号