Analysis of the Probabilistic Cost Variation Ranges According to the Effect of Core Quantitative Risk Factors for an Overseas Plant Project : Focused on a Middle East Gas Plant Project

机译:基于核心量化风险因素影响的海外工厂项目的概率成本变动范围分析:以中东天然气厂项目为中心

获取原文
获取原文并翻译 | 示例
           

摘要

The purpose of this study targets overseas gas plant construction projects with the aim of analyzing the probabilistic cost variation range with consideration of the effect of core quantitative risk factors. C-Project, which is expected to be completed by a domestic construction company in country U, was thus selected as the subject of analysis. By interviewing experts through survey questions, the core quantitative risk factors for the engineering, procurement, and construction phases were derived. Based on these risk factors, the cost variation range, which is caused by the risk factor effects on project cost, was analyzed. Monte Carlo simulation was applied to this quantitative cost variation result, and the probabilistic cost variation range was assessed. The summarized results of this study are as follows: The probabilistic cost variation range for each phase, with consideration of the effect of core quantitative risk factors, is: an engineering cost of -1.95% to 2.49%, procurement cost of -3.07% to 3.91%, construction cost of -2.99% to 3.80%, and a total project cost of -2.58% to 3.50%. The analysis model and analysis result from this study can be used as decision-making tools to help minimize the economic loss resulting from the effect of risk factors during the overseas plant construction process.
机译:这项研究的目标是针对海外天然气厂建设项目,目的是在考虑核心定量风险因素的影响的情况下分析概率成本变化范围。因此,选择了预期由U国的一家国内建筑公司完成的C-项目作为分析对象。通过调查问题采访专家,得出了工程,采购和施工阶段的核心定量风险因素。基于这些风险因素,分析了由风险因素对项目成本的影响所引起的成本变动范围。将蒙特卡洛模拟应用于此定量成本变动结果,并评估了概率成本变动范围。本研究的总结结果如下:考虑到核心定量风险因素的影响,每个阶段的概率成本变化范围为:工程成本为-1.95%至2.49%,采购成本为-3.07%至3.91%,建筑成本为-2.99%至3.80%,总项目成本为-2.58%至3.50%。这项研究的分析模型和分析结果可以用作决策工具,以最大程度地减少海外工厂建设过程中由于风险因素的影响而造成的经济损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号