首页> 外文期刊>KSCE journal of civil engineering >Critical review of previous studies on labor productivity loss due to overtime
【24h】

Critical review of previous studies on labor productivity loss due to overtime

机译:对以前因加班而导致劳动生产率下降的研究的评论性评论

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Timely completion has been one of the most important concern due to its impact on both owner and contractor. When schedule is behind, one of most widely used schedule acceleration methods is working longer time: overtime. Overtime practice is one of key management decision because it may have a negative impact on labor productivity. Since overtime is the most widely used and numerous studies concluded that excessive amounts of overtime work could serious negative impact on labor productivity, quantification of the effect of overtime on labor productivity has been discussed in a number of papers. However, it was found that most studies reviewed in this paper have pitfalls. Most of them are out of date, based on a small sample size, and largely developed from questionable or unknown sources. Very little is known about how and from where the data were collected. Where the data source is known, little is known about other pertinent information, such as the characteristics of the project, work environments, quality of management and supervision, type of work, and trades involved. These information should be clearly provided to the users, who considers overtime to speed up the work, to see whether the result of the previous studies can be applied to the work he/she is currently doing. At the same time, for the researcher, this study will be able to guide what characteristics should be considered when he/she want to quantify the effect of overtime on construction labor productivity so that practitioners will not misuse the result of studies.
机译:由于及时完成对业主和承包商都有影响,因此一直是最重要的问题之一。当进度落后时,最广泛使用的进度加速方法之一是工作时间更长:加班。加班实践是关键管理决策之一,因为它可能对劳动生产率产生负面影响。由于加班是最广泛使用的,并且大量研究得出结论,过多的加班工作可能对劳动生产率产生严重的负面影响,因此在许多论文中都讨论了加班对劳动生产率的影响的量化方法。但是,发现本文所综述的大多数研究都有陷阱。它们中的大多数都是过时的(基于少量样本),并且很大程度上是从可疑或未知来源发展而来的。对于如何以及从何处收集数据知之甚少。在知道数据源的地方,对其他相关信息知之甚少,例如项目的特征,工作环境,管理和监督的质量,工作类型以及所涉及的行业。这些信息应清楚地提供给考虑加班以加快工作速度的用户,以查看以前的研究结果是否可以应用于他/她目前正在从事的工作。同时,对于研究人员来说,这项研究将能够指导他/她想量化加班对建筑劳动生产率的影响时应考虑哪些特征,从而使从业者不会滥用研究结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号