Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost.

机译:考虑学习和计划加班的影响:开发动态模型以估计和控制人工时间和人工成本。

获取原文
获取原文并翻译 | 示例

摘要

Labor cost is a major part of construction cost, and it is important for contractors to accurately estimate and control labor cost on their construction projects. Current methods of estimating labor productivity generally do not consider the quantity of work and resulting number of repetitions of a task nor the impact of overtime, when it occurs. Instead, current labor estimating and control practice assumes a linear relationship between quantity of work and time and cost of labor. But this is not true in practice. As the workers continue on an assigned task, they develop site-specific familiarity that allows them to perform that task more efficiently, and their productivity therefore increases. This is called the learning effect.; Some projects require workers to work scheduled overtime, which increases worker fatigue under which work is less productive. This is called the overtime effect. Learning and overtime interact resulting in complex changes in rates of productivity. Due to these variations of the productivity rate in a construction task, non-linear dynamic time estimating and control models are more appropriate than linear static time models. The objective of this dissertation is to develop models that can include non-linear dynamic effects, specifically labor time and cost estimating and control models for use with single tasks and complex tasks.; The body of this dissertation is separated into three parts: learning, overtime, and labor time and cost estimating and control. Chapter 2 discusses the unit learning curve and the cumulative learning curve models with attention to four areas: fitting and predicting accuracy, time estimating models with processes of obtaining learning curve factors from construction sites, unit sizes, and combination of subtasks. Chapter 3 presents improved Business Roundtable (BRT) information, new overtime functions, and estimating models based on an overtime Table that is developed from the improved BRT information. Chapters 4, 5, and 6 use the time estimating models from Chapters 2 and 3 to include the impacts of learning and/or overtime on labor time and cost estimating and control. In total, this dissertation develops and demonstrates methods by which managers can better estimate and control projects by including the impacts of learning and overtime.
机译:人工成本是建筑成本的重要组成部分,对于承包商准确估算和控制其建筑项目的人工成本至关重要。当前估计劳动生产率的方法通常不考虑工作量和任务重复的结果,也不考虑加班的影响。取而代之的是,当前的劳动力估算和控制实践假设工作量与时间和劳动成本之间存在线性关系。但这在实践中是不正确的。随着工作人员继续执行分配的任务,他们会形成特定于站点的熟悉度,从而使他们能够更有效地执行该任务,从而提高了生产率。这称为学习效果。一些项目要求工人按计划加班,这会增加工人的疲劳度,导致工作效率降低。这称为加班效应。学习和加班互动会导致生产率的复杂变化。由于施工任务中生产率的这些变化,非线性动态时间估计和控制模型比线性静态时间模型更合适。本文的目的是开发可以包含非线性动态影响的模型,特别是用于单个任务和复杂任务的人工时间和成本估算以及控制模型。本文的主体分为三个部分:学习,加班以及劳动时间和成本估算与控制。第2章讨论单元学习曲线和累积学习曲线模型,并关注四个方面:拟合和预测准确性,具有从施工现场获取学习曲线因子的过程,单元大小和子任务组合的时间估计模型。第3章介绍了改进的业务圆桌会议(BRT)信息,新的加班功能以及基于根据改进的BRT信息开发的加班表的估算模型。第4、5和6章使用第2章和第3章中的时间估计模型来包括学习和/或加班时间对人工时间以及成本估计和控制的影响。总体而言,本文开发并演示了管理者可以通过包括学习和加班的影响来更好地估计和控制项目的方法。

著录项

  • 作者

    Taemthong, Wannawit.;

  • 作者单位

    University of Michigan.;

  • 授予单位 University of Michigan.;
  • 学科 Engineering Civil.; Engineering Industrial.
  • 学位 Ph.D.
  • 年度 2002
  • 页码 450 p.
  • 总页数 450
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;一般工业技术;
  • 关键词

  • 入库时间 2022-08-17 11:46:35

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号