首页> 外文期刊>Journal of Cleaner Production >Planning for sustainable stakeholder engagement based on the assessment of conflicting interests in projects
【24h】

Planning for sustainable stakeholder engagement based on the assessment of conflicting interests in projects

机译:基于对项目中利益冲突的评估,规划利益相关者的可持续参与

获取原文
获取原文并翻译 | 示例
           

摘要

The absence or lack of effective stakeholder engagement during project life cycle, especially at the earlier stages of planning and implementation often negatively impacts the expected performance of projects. These coupled consequences of the lack of contextual knowledge from the stakeholders as well as lack of their support in the field necessitates effective stakeholder engagement. However, this integration faces challenges such as limitations of project resources and conflicting interests of the stakeholders. In this sense, project resources can be allocated based on the priorities of the fields of conflicts to facilitate stakeholder engagement of the projects. The goal of this paper is to provide a framework to enhance effectiveness of the stakeholder engagement in projects by systematically ranking the potential conflicts while combining the viewpoints of stakeholders and project management team. For this purpose, we draw on stakeholder theory, value-based management, matrix-based dependency modeling, and Total Quality Management to develop a stakeholder engagement framework while considering fuzzy inputs for reflecting the ambiguities at the project life cycle. The proposed approach is then applied to plan stakeholder engagement in case of a green building project in Iran. Practically, application of the proposed framework facilitates stakeholder engagement for project managers in line with sustainable goals through early assessment of the fields of potential conflicts of interests. (C) 2019 Elsevier Ltd. All rights reserved.
机译:在项目生命周期中,尤其是在计划和实施的早期阶段,缺乏或缺乏有效的利益相关者参与通常会对项目的预期绩效产生负面影响。由于缺乏利益相关者的背景知识以及他们在现场缺乏支持,这些相关的后果使得利益相关者必须有效参与。然而,这种整合面临挑战,例如项目资源的限制和利益相关者利益的冲突。从这个意义上讲,可以根据冲突领域的优先级分配项目资源,以促进利益相关者参与项目。本文的目的是提供一个框架,通过系统地对潜在冲突进行排序,同时结合利益相关者和项目管理团队的观点,从而提高利益相关者参与项目的有效性。为此,我们利用利益相关者理论,基于价值的管理,基于矩阵的依存关系建模和全面质量管理来开发利益相关者参与框架,同时考虑模糊输入以反映项目生命周期中的歧义。然后,在伊朗的绿色建筑项目中,将拟议的方法应用于计划利益相关者的参与。实际上,通过对潜在利益冲突领域进行早期评估,采用拟议框架可以促进利益相关者参与项目经理,使其符合可持续发展目标。 (C)2019 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号