Computer based project planning and tracking system is configured so that flexible time windows for completion or starting of a task can be defined with the tolerance range based on a probability assessment
Computer based project planning and tracking system is configured so that flexible time windows for completion or starting of a task can be defined with the tolerance range based on a probability assessment
Computer system for project planning and tracking has processing, input and display units. The display unit displays the output of an application in which an undefined time period with a given tolerance range for carrying out an activity can be input. At least one tolerance range is assigned to the possibility that a given activity will have been started or completed within the selected time period. The invention also relates to a corresponding method.