...
首页> 外文期刊>Journal of bridge engineering >Block FEM for Time-Dependent Shear-Lag Behavior in Two I-Girder Composite Bridges
【24h】

Block FEM for Time-Dependent Shear-Lag Behavior in Two I-Girder Composite Bridges

机译:两段工字梁组合桥中随时间变化的剪力滞行为的块有限元法

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper presents a time-dependent finite-element analysis of a two I-girder composite bridge with a concrete slab. The creep and shrinkage of the concrete slab are considered as sources of time-dependent behavior. This analysis, unlike others, includes the shear-lag effect of the concrete slab on the time-dependent behavior of two I-girder bridges. An example calculation is given for a two-span continuous composite bridge with a cracking region in the concrete deck near the interior support. It is shown that the shear-lag effect becomes significant at the edge of the cracking region and at the bridge ends.
机译:本文提出了一个带有混凝土板的两工字梁组合桥的时变有限元分析。混凝土板的蠕变和收缩被认为是时间相关行为的来源。与其他分析不同,该分析包括混凝土平板对两个工字梁桥的时变行为的剪力滞效应。给出了一个两跨连续组合桥的示例计算,该桥在内部支撑附近的混凝土甲板中具有裂缝区域。结果表明,剪切滞后效应在裂纹区域的边缘和桥的两端变得明显。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号