首页> 外文期刊>Journal of bridge engineering >Testing and Analysis of Precast Columns with Grouted Sleeve Connections and Shifted Plastic Hinging
【24h】

Testing and Analysis of Precast Columns with Grouted Sleeve Connections and Shifted Plastic Hinging

机译:灌浆套筒连接和移位塑料铰链的预制柱的测试和分析

获取原文
获取原文并翻译 | 示例

摘要

Prefabricated reinforced concrete column connections employing grouted sleeve (GS) splices enable rapid construction, are familiar to contractors, and their detailing resembles cast-in-place (CIP) construction. Previous studies showed disrupted plastic hinge formation in the stiff sleeve region. The proposed design method shifts the plastic hinge location above the sleeve region, which effectively increases the plastic rotation capacity and ductility. Plastic hinge shifting was realized by using transition splicing and high-strength steel reinforcement in the connecting element (footing). The proposed method was investigated experimentally using two 0.42-scale column tests under slow cyclic loading and a series of uniaxial tensile tests. Results indicate that good ductility can be achieved compared with conventional CIP construction and previously tested GS connections details. Experimental and analytical moment-curvature results were used to support discussion of design considerations and of an approximate method for calculating the displacement ductility of precast columns with GS connections and shifted plastic hinging. (C) 2017 American Society of Civil Engineers.
机译:预制钢筋混凝土柱连接采用灌浆套管(GS)接头,可快速施工,对于承包商而言是熟悉的,其细节类似于现浇(CIP)施工。先前的研究表明,僵硬套筒区域的塑料铰链形成受到破坏。提出的设计方法将塑料铰链位置移到套筒区域上方,从而有效地增加了塑料的旋转能力和延展性。通过在连接元件(底脚)中使用过渡拼接和高强度钢筋来实现塑料铰链移动。在慢循环载荷下使用两个0.42规模的柱试验和一系列单轴拉伸试验对提出的方法进行了实验研究。结果表明,与常规CIP结构和先前测试的GS连接细节相比,可以实现良好的延展性。实验和分析的弯矩曲率结果用于支持设计注意事项的讨论以及用于计算具有GS连接和位移塑性铰的预制柱位移延性的近似方法。 (C)2017年美国土木工程师学会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号