首页> 外文期刊>Engineering Structures >Grouted sleeve connections used in precast reinforced concrete construction - Experimental investigation of a column-to-column joint
【24h】

Grouted sleeve connections used in precast reinforced concrete construction - Experimental investigation of a column-to-column joint

机译:预制钢筋混凝土建筑中使用的灌浆套筒连接-柱间连接的实验研究

获取原文
获取原文并翻译 | 示例
       

摘要

The results of an experimental campaign concerning full-scale tests on precast reinforced concrete column-to-column connections made with grouted sleeve splices are presented. The precast column units had a square cross-section with the side of 500 mm. Eight 20 mm-diameter bars protruding from one unit were grouted into corrugated steel sleeves encased in the other unit. The column-to-column connections were subjected to three monotonic tests (axial tension and four-point bending with and without axial compression) and to two cyclic tests (four-point bending and shear).
机译:介绍了有关对用灌浆的套管接头进行的预制钢筋混凝土柱对柱连接进行全面测试的实验结果。预制柱单元的横截面为正方形,侧面为500毫米。从一个单元中伸出的八根直径为20 mm的钢筋被灌入装在另一单元中的波纹钢套筒中。列到列的连接经历了三个单调测试(轴向拉伸和有和没有轴向压缩的四点弯曲)和两个循环测试(四点弯曲和剪切)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号