首页> 外文期刊>日本建築学会計画系論文集 >繰返し工程に関する工程計画手法の開発: ネットワーク図の表現と日程計算
【24h】

繰返し工程に関する工程計画手法の開発: ネットワーク図の表現と日程計算

机译:迭代过程的过程计划方法的开发:网络图表示和调度

获取原文
获取原文并翻译 | 示例
       

摘要

Although the network method is recognized as an inevitable method for planning and scheduling in building construction projects, it has been applied to less construction projects as a planning and scheduling method, as it is not suitable for repetitive activities such as high-rise multi-floor buildings and large apartment buildings with many dwellings. The authors proposed a new graphical representation method which is based on the conventional network diagram and scheduling method for the building project with repetitive activities. Then, the authors applied these methods to plan and schedule a four-story apartment house with 32 dwellings, and verified the usefulness to represent the sophisticated precedence relationships among many work zones and to calculate the earliest date and the latest date of each activity in the construction project.%1950年代後半に開発されたPERT/CPM手法(以下、ネットワーク手法)は、ポラリス弾道弾開発や宇宙船計画において大きな成果を収め、日本では1960年代において建築工事の工程計画に活用しようとする動きが広がった。また、1980年には日本建築学会において「工程ネットワーク手法指針·同解説」が纏められ、日本における普及が進められた。現在では、ネットワーク手法は、建築工事の工程を考える上で重要な手法であると広く認識されている。しカゝし、実務での活用は限られており、工程を図的に表現する手段として使われることは多いが、ネットワーク手法に基づいて日程計算や資源配分計算を行うことは稀である。
机译:尽管网络方法被认为是建筑施工项目中不可避免的计划和计划方法,但由于它不适用于高层多层建筑等重复性活动,因此已作为较少的计划和计划方法应用于较少的建筑项目。建筑物和带有许多房屋的大型公寓楼。作者提出了一种新的图形表示方法,该方法基于具有重复性活动的建筑项目的常规网络图和调度方法。然后,作者运用这些方法来计划和安排一个32层高的四层公寓房,并验证了表示多个工作区域之间复杂的优先关系并计算每个活动的最早日期和最新日期的有用性。 1950年代后半に开発されたPERT / CPM手法(以下,ネットワーク手法)は,ポラリス弾道弾开発や宇宙船计画において大きな成果を收め,日本では1960年代において建筑工事の工程计画に活用しようとまた,1980年には日本建筑学会において「工程ネットワーク手法指针·同解说」が缠められ,日本における普及が进められた。现在では,ネットワーク手法は,建筑工事の工程を考える上し重要な手法であると広く认识されている。しカを図,実务での活用は限られており,工程を図的に表现する手段として使われることは多いが,ネットワーク手法に基づいて日程计算や资源配分计算を行うことは稀である。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号